We are proud to have been able to implement the following projects.
To avoid traffic jams on the Niederrhein around the A3 construction site near Hamminkeln, our fully automatic contraflow traffic management system "DynaSwitch" is used.
Click here for the article from WDR (in german only)
Between Lucerne and Hergiswil, 2 existing central reservation crossings were replaced and equipped with "DynaGate". These are two 2-leaf systems, each 90 m long, which take up their position fully automatically when the operating status is selected. Operation is possible from the control cabinet at the roadside and also from the system itself. Containment level "H2". Version 2022
A bridge had to be renovated on the A93 between Pfreimd and Nabburg. Our "DynaSwitch" turnout was used for contraflow traffic management from March to October 2022.
On the A7 near Rothenburg ob der Tauber, 10 km of the highway are being renovated. Our "DynaSwitch" turnout was used for contraflow traffic management.
Installation of crash barrier systems in the Küssnacht - Arth section.
The Stellingen and Schnelsen tunnels in Hamburg were equipped with a total of 15 DynaResc (with containment level T3).
Installation of crash barrier systems and impact absorbers.
Development, construction and installation of two single-wing central reservation crossings with an opening length of 84 meters, automatic closure system, lowering and containment level "H2". Execution 2019.
Development and construction of the control system for the battery-operated version of Garaventa's "Monorack".